The Garside Pool and Bathhouse Replacement project, built for the City of Las Vegas, included the demolition of an existing pool, equipment house, and parking lot and the new construction of a 4,305-square-foot municipal aquatic facility. The replacement facility includes a four-lane lap pool, a zero-depth splash pad, two water slides, a bathhouse with showers, changing stalls, and storage space. The aquatic facility was constructed on a concrete foundation with a concrete masonry unit structural frame and exterior. A standing seam and TPO roof completed the construction. Site work consisted of litho mosaic concrete panels, retaining walls, and a no-climb fencing system around the perimeter. The Garside Pool and Bathhouse Replacement project now provides state-of-the-art facilities for community enjoyment.
Explore