May 9, 2022 / 
Flagstaff, 
AZ

NAU opens $46M Student-Athlete High Performance Center

The opening of the new Student-Athlete High Performance Center elevates Northern Arizona University’s offerings to all current and future Lumberjack student-athletes. University leaders, local dignitaries, past and current Lumberjacks, and community members gathered to celebrate the grand opening on April 22, 2022. DLR Group designed the facility, which was built by CORE Construction.

The new 72,000 SF, $46 million training center is located on South San Francisco Street, east of J. Lawrence Walkup Skydome, an indoor multipurpose stadium utilized by various Lumberjack programs. Nestled into a hillside filled with ponderosa pines and views of Humphreys Peak, the center substantially increases academic, weight training, recovery, and nutrition space available to Lumberjack student-athletes. It also is the first NAU athletics facility partially funded through alumni and former student-athlete contributions.

Entering the building is an experience all its own. Visitors cross a 140-foot walking bridge that begins at the base of the tree line and elevates 20 feet to canopy level of the old growth trees before reaching the entry, which allowed DLR Group to leave the site as untouched as possible. Once inside, patrons are immersed in the Grand Hall where championships are celebrated and memorabilia is displayed to capture the essence of the Lumberjacks.

Read the full article as published by AZ Big Media
Image courtesy of AZ Big Media

Share

Related News

divider-cap-04

Excellence is Our Standard